1. The compacted area is then flooded with ASR-I grout at a rate of 20m3/hour using the ADR mobile flood
Category: Route A
Flood Grouting System 2
2. Grout hardens within 30 minutes.
1. The compacted area is then flooded with ASR-I grout at a rate of 20m3/hour using the ADR mobile flood
2. Grout hardens within 30 minutes.